Volume 41 - Issue 9 - March 3, 2022
State of 麻豆影院
Department of Transportation
Notice to Consulting Firms
The 麻豆影院 Department of Transportation (KDOT) is seeking a qualified consulting firm or team of firms to perform professional services for the project(s) described in Table 1 below. Interested consultants must email a proposal to KDOT.DesignContracts@ks.gov by 12:00 p.m. (CST) March 18, 2022, to be considered for selection.
Consultant Prequalification
Interested consulting firms must be prequalified by KDOT or otherwise demonstrate qualification in Category 241 Construction Inspection and Testing.
If a firm is not currently prequalified by KDOT, a proposal may still be submitted. Firms not prequalified must also provide documentation that demonstrates the firm is qualified for each specified category listed in this notice for the project. Firms must use the KDOT prequalification form to provide this documentation. KDOT 1050 Prequalification Category Definitions (Blue Book) can be found at . Consultants may create a team to meet the prequalification requirements. All firms doing business with KDOT must be registered and in good standing under the laws of the State of 麻豆影院 at the time of contracting and must comply with applicable state and federal laws, rules, and regulations.
| Table 1: Background and Scope of Project | |
|---|---|
| Project Number | Background and Scope of Project |
| KA-6398-01 | Project manager and inspectors as necessary to inspect: HMA plant, HMA roadway, pavement marking, traffic control, CMS or AASHTOWare data entry, all project records, all project paperwork, and final paperwork, etc. |
| Table 2: Project Summary | ||
|---|---|---|
| Project Number | Route and Scope | Project Location |
| KA-6398-01 | 鲍050鈥056 3-inch overlay and rumble strips on centerline and shoulders |
US-50 in Lyon County beginning at the Chase/Lyon County line to junction Road E 5/US-50 |
Anticipated Consultant Scope
KDOT anticipates the following to be included in the consultant鈥檚 scope: Construction Inspection/Testing.
This effort will be managed out of the KDOT office in Emporia, 麻豆影院.
Anticipated Schedule and Key Dates
- Proposals are due by or before 12:00 p.m. (CST) March 18, 2022
- Anticipated Start Date: July 15, 2022
- Estimated Working Days: 50 days
Instructions for Proposal
- No cost or pricing information shall be submitted with the proposal. Proposals including cost or pricing information will be considered non-responsive and withdrawn from further consideration.
- The consultant鈥檚 proposal must not exceed 4 pages total (including any cover letter, index, etc.)
- A PDF (2MB maximum size) of the proposal must be emailed to KDOT.DesignContracts@ks.gov by the proposal due date and time.
- The subject line of the email and the PDF file name must read:
- 鈥淜A-6398鈥揅onstInsp Pvmt Resurf in Lyon Co_FIRM NAME鈥
- The proposal must be accompanied by Special Attachments No. 8 (鈥淭ax Clearance Certificate鈥) and No. 10 (鈥淧olicy Regarding Sexual Harassment鈥). If you need a Tax Clearance Certificate, you can request one at .聽Allow 2-3 business days for processing.
- The outline in Table 3 below describes the expected proposal organization and content sections.
- Table 4 lists the evaluation criteria and associated weights which will be used to make a selection.
| Table 3: Proposal Content | |
|---|---|
| Section | Description of Intent |
| Cover Letter | (no more than 1 page) |
| Project Approach | Describe how your firm will meet the fluctuating inspection needs of the project. |
| Approach to Quality Control | Describe methods or procedures your firm will use to provide all services with professional quality and technical accuracy. |
| Qualifications and Experience | For key personnel to be assigned to the project provide names, qualifications, education, training, and expertise. Identify their area(s) of responsibility and percent of their time dedicated to the project. List work for which you do not have in-house capability and name the firm you propose to subcontract with. |
| Past Performance | Describe team鈥檚 past performance with respect to ability to meet project schedules; quality of work; and ability to control costs on similar transportation projects, especially those performed for KDOT. Include three references and contact information. |
| Familiarity with KDOT and Project Area | Describe team鈥檚 familiarity with KDOT鈥檚 inspection processes and standards. Describe familiarity with the project area and any identified special site conditions. |
| Table 4: Evaluation Factors | |
|---|---|
| Evaluation Factor | Weight |
| The quality and completeness of the response | 10% |
| Availability to respond to the work | 20% |
| Qualifications and experience of project manager and other key project team members proposed for services | 20% |
| Past performance history for similar projects/services for KDOT | 20% |
| Understanding of the project area | 10% |
| Understanding of KDOT contract administration and closeout procedures | 20% |
Contract Terms and Conditions
A standard KDOT agreement for engineering and technical services will be used for professional services projects. The following special attachments will need to be provided by the selected consultant and all subconsultants with the signed work order following negotiations and will become attachments to the contract.
- Special Attachment No. 8 (鈥淭ax Clearance Certificate鈥)
- Special Attachment No. 10 (鈥淧olicy Regarding Sexual Harassment鈥)
Questions
All questions regarding this request for proposals shall be emailed to KDOT.DesignContracts@ks.gov.
Questions can be submitted until March 10, 2022; answers will be provided to all prequalified consultants on March 14, 2022.
Marcia Turner, P.E., Contracts Manager
Division of Engineering and Design
Doc. No. 049897